The canopies will shelter materials from rain and provide more protection against runoff, according to city officials.
The structures will be between 20 to 26 feet high. The recycling facility also will add a 300-foot-long concrete slab for storage of metals, paper, glass and plastic and other recyclables.
Funds for the upgrades will come from a $12.5 million bond sale the council approved last year for upgrades at the plant, which it operates with Napa Recycling and Waste Services.
The remaining bond funds will be devoted to building a covered composting system to improve air quality and improvements in stormwater processing. The plant is required by the state to cover its composting area by 2018. The article says improvement to the composting area will be a critical part in managing food scraps it started collecting in 2015 as part of its goal to achieve a 75 percent recycling rate by 2020. A contract for those upgrades is expected to go before the council in September, according to the article.
Latest from Recycling Today
- Greenwave raises revenue but loses money in Q2 2025
- Recycled steel prices hold steady
- EY says India’s need for scrap imports will continue
- Coming full circle
- Amcor, DCM introduce fertilizer packaging with 35 percent recycled content
- Comstock Metals gets closer to commissioning commercial-scale solar panel recycling facility
- Washington selects Circular Action Alliance as PRO
- Smurfit Westrock expands in Latin America